Ireland: Difference between revisions
Jump to navigation
Jump to search
Kevin Sharpe (talk | contribs) No edit summary |
Cookie6000 (talk | contribs) (Update on forms, procedures and details needed) |
||
Line 1: | Line 1: | ||
In Ireland Damien Maguire | In Ireland Damien Maguire and Fiachra Cooke have developed a highly efficient procedure for putting electric car conversions on the road quickly and cheaply. | ||
Note that during the conversion process two golden rules are followed, no cutting the chassis or any other structural components, and strictly adhering to axle weight limits as published on the cars rating plate or manufacturers documentation. | Note that during the conversion process two golden rules are followed, no cutting the chassis or any other structural components, and strictly adhering to axle weight limits as published on the cars rating plate or manufacturers documentation. | ||
Here's the procedure; | Here's the procedure; | ||
* Get in touch with a local accredited Automotive Engineer and have them look at your build when you are at a point before you are ready to go cut and weld parts to the chassis. This will enable him/her to discuss and review the placement of key components, integrity of structural components (motor mounts, battery boxes, etc), and weight distribution. Ideally, try and get the use of corner scales before and after the build. | |||
* The engineer will primarily be interested in answering the question of whether the vehicle is safe to put on the road. If the Engineer is unhappy with any aspects of the build, they will request modifications and another inspection will be required to verify action has been taken. | |||
* If the advice is followed however and the Engineer is happy on the second visit at completion, they will complete a final engineers report signing off the build. Request they complete Section 5 of the RF111 Change of Particulars form https://www.motortax.ie/OMT/pdf/RF111_en.pdf complete with date of motor change, motor serial number and finally, signed and stamped by the accredited engineer. | |||
* Worth asking for an RSA Modifications Report also for when the time comes for the NCT https://rsa.ie/Documents/VS_Information_Notes/Special_Permits/Modifications%20Report%20-%20June%202015.pdf | |||
* Written report by Automotive Engineer is received in ~7 days. | |||
* Documents to send to your local motor tax office | |||
** Automotive Engineers report - signed and stamped | |||
** Completed RF111 Change of Particulars form - Section 5 - signed and stamped | |||
** Vehicle Registration Certificate (VRC) | |||
** Cover letter outlining you and your project, the how, why, where, etc. | |||
* Change of taxation class to electric is delivered, usually in around 7 days. | |||
* Tax vehicle (currently €120) | |||
* Insure Vehicle - This was actually possible once you had the completed engineer's report | |||
* Test vehicle (NCT) - Bring all documentation submitted to local motor tax office as well as the RSA Modifications Report | |||
* Drive off into the electrified sunset... |
Revision as of 20:30, 25 November 2020
In Ireland Damien Maguire and Fiachra Cooke have developed a highly efficient procedure for putting electric car conversions on the road quickly and cheaply.
Note that during the conversion process two golden rules are followed, no cutting the chassis or any other structural components, and strictly adhering to axle weight limits as published on the cars rating plate or manufacturers documentation.
Here's the procedure;
- Get in touch with a local accredited Automotive Engineer and have them look at your build when you are at a point before you are ready to go cut and weld parts to the chassis. This will enable him/her to discuss and review the placement of key components, integrity of structural components (motor mounts, battery boxes, etc), and weight distribution. Ideally, try and get the use of corner scales before and after the build.
- The engineer will primarily be interested in answering the question of whether the vehicle is safe to put on the road. If the Engineer is unhappy with any aspects of the build, they will request modifications and another inspection will be required to verify action has been taken.
- If the advice is followed however and the Engineer is happy on the second visit at completion, they will complete a final engineers report signing off the build. Request they complete Section 5 of the RF111 Change of Particulars form https://www.motortax.ie/OMT/pdf/RF111_en.pdf complete with date of motor change, motor serial number and finally, signed and stamped by the accredited engineer.
- Worth asking for an RSA Modifications Report also for when the time comes for the NCT https://rsa.ie/Documents/VS_Information_Notes/Special_Permits/Modifications%20Report%20-%20June%202015.pdf
- Written report by Automotive Engineer is received in ~7 days.
- Documents to send to your local motor tax office
- Automotive Engineers report - signed and stamped
- Completed RF111 Change of Particulars form - Section 5 - signed and stamped
- Vehicle Registration Certificate (VRC)
- Cover letter outlining you and your project, the how, why, where, etc.
- Change of taxation class to electric is delivered, usually in around 7 days.
- Tax vehicle (currently €120)
- Insure Vehicle - This was actually possible once you had the completed engineer's report
- Test vehicle (NCT) - Bring all documentation submitted to local motor tax office as well as the RSA Modifications Report
- Drive off into the electrified sunset...